Start from zero: a wall cut into strips
Ramesh can paint a school wall in 12 days, and Suresh can paint the same wall in 6 days. If they work together, how long will it take? Many students add the days and say 18, but two people working together must finish faster than either one alone.
Think of the wall as 12 equal strips. Ramesh paints 12 strips in 12 days, so he paints 1 strip a day. Suresh paints 12 strips in 6 days, so he paints 2 strips a day. Together they paint 3 strips a day, and 12 strips take 12 ÷ 3 = 4 days.
The key idea is the rate of work: how much of the job is done in one unit of time. Days do not add, but rates do. Once you know each person's rate, every question in this chapter becomes simple addition and division.
Why this topic exists. Every project, from a road to a vaccination drive, asks the same question: with these people and these machines, how long will it take? Planners estimate labour and time before money is released. The puzzles in this chapter are small, clean versions of that everyday planning.
Rates add, days do not
The fraction way. If a person finishes a job in n days, he does 1⁄n of it in one day. Ramesh does ¹⁄₁₂ a day and Suresh ¹⁄₆ a day. Together they do ¹⁄₁₂ + ¹⁄₆ = ³⁄₁₂ = ¼ a day, so the job takes 4 days.
The two-person formula. For A in a days and B in b days, the joint rate is 1⁄a + 1⁄b = (a + b) ÷ ab. Turning the rate upside down gives the time: ab ÷ (a + b) days. For 12 and 6 days this is 72 ÷ 18 = 4 days, the same answer.
Three people. Add all three rates. If A, B and C take 10, 15 and 30 days, the rates are ¹⁄₁₀ + ¹⁄₁₅ + ¹⁄₃₀ = ⁶⁄₃₀ = ⅕, so together they need 5 days. Do not try to use the two-person formula twice on three people without care; adding rates is safer.
Working backwards. If A and B together take 8 days and A alone takes 12, then B's rate is ⅛ − ¹⁄₁₂ = ¹⁄₂₄. So B alone needs 24 days. Subtracting rates finds the missing person.
A quick sense check. The time taken together is always less than the time of the faster worker alone. If two people take 12 and 6 days, the answer must be below 6. Any option above 6 can be struck off at once.
Why it matters. The rate idea is the backbone of the whole chapter, and of speed and distance in the next chapter too. Learn to ask "how much in one day?" before anything else.
Quick revision
- One day's work = 1 ÷ (days for the whole job), and rates of people working together add.
- Two people taking a and b days finish together in ab ÷ (a + b) days.
- Take the total work as the LCM of the days, so each person's daily work is a whole number.
- Efficiency × time = total work, so a person twice as efficient takes half the time.
- Wages are shared in the ratio of work done.
- Man-days rule: M₁ × D₁ × H₁ ÷ W₁ = M₂ × D₂ × H₂ ÷ W₂.
- Filling pipes add, emptying pipes and leaks subtract.
- With phases or turns, add the work of each phase and watch the last day.