- Prelims Paper I: General Studies · Geography of Uttarakhand: location, relief, climate, drainage, vegetation, wildlife, minerals, agriculture, animal husbandry, irrigation, major cities and tourist places, population, transport, power and industry, natural hazards.
- Prelims Paper I: General Studies · Current events of State, National and International importance, plus general knowledge: nations, space events, books and authors, scientists, awards, defence, national symbols, protocol, dances, music, languages, world heritage, important days and sports.
- Mains Paper 2: Essay · Section C: social structure, history, culture, art and literature, economy, geography, tourism and migration, environment and disaster management, and women empowerment in Uttarakhand.
- Mains Paper 7: General Studies V (Uttarakhand: history, society, polity) · Current events in the context of Uttarakhand state.
- Mains Paper 8: General Studies VI (Uttarakhand: geography, economy, development) · Geography of Uttarakhand- Location, Extent and Strategic Importance, Structure and relief, Climate, Drainage System, Natural Vegetation, Soil, Glacier, Lake and Climate Change. Resources- Forest, Water, Minerals and Land, Agriculture, Irrigation, Horticulture, Animal Husbandry, Industry. Transport – Road, Rail and Air.
- Mains Paper 8: General Studies VI (Uttarakhand: geography, economy, development) · Hydro-electric Projects, Water Scarcity and Solution.
UKPSC PCS (Upper) has asked 2 questions from this chapter (2025); 23 from its whole module.
Read at full depth: basics, the standard layer and the Mains analysis.
Start from zero: what the mountains give
Ask a hill family what their mountains give them, and they will talk about water, forests and stone. Uttarakhand has few metal ores but plenty of falling water, building stone and river sand. Its real wealth is energy, not minerals.
The rivers drop thousands of metres from glaciers to the plains in a short distance. This steep fall can turn turbines, so the state is called the "energy state" (urja pradesh). Its hydropower potential is estimated at over 20,000 MW, and only part of it is in use.
But moving that energy, and people and goods, through steep, unstable mountains is hard. Roads, railways and tunnels bring growth but also landslides.
Why it matters. Minerals, energy and transport decide the state's income and jobs. They also create the biggest conflicts between development and the fragile Himalayan environment.
Minerals
The most important minerals of Uttarakhand are those used in industry and building. Limestone is found in the Shiwalik and Lesser Himalaya, including the Doon valley and Mussoorie hills. Magnesite, used for heat-resistant bricks in steel furnaces, comes from Almora, Pithoragarh and Bageshwar. Soapstone (talc) is mined in Bageshwar and Almora, and phosphorite near Mussoorie.
The most widely mined materials, however, are sand, gravel and boulders from river beds, used in building. Illegal river-bed mining is a serious problem, as it deepens channels, damages bridges and harms fish.
In the 1980s, heavy limestone quarrying was scarring the Mussoorie hills and drying the springs of the Doon valley. In the Rural Litigation and Entitlement Kendra case, the Supreme Court ordered most quarries closed. It was one of India's first big environmental judgements, balancing industry against the right to a healthy environment.
Why it matters. Mining shows the trade-off between income and ecology in the hills. The Doon quarrying case is a classic example for Mains answers on environmental law.
Hydropower: the energy state
The giant of the state's power system is the Tehri dam on the Bhagirathi, run by THDC India Limited. At about 260.5 metres, it is India's highest dam. The Tehri complex includes the 1,000 MW dam power station, the 400 MW Koteshwar project downstream and a 1,000 MW pumped storage plant that pumps water back up when power is cheap and releases it when demand peaks.
Other important projects include Maneri Bhali on the Bhagirathi, Vishnuprayag on the Alaknanda, Chibro and Khodri on the Yamuna–Tons system, Dhauliganga in the Kali basin run by NHPC, and Tapovan–Vishnugad of NTPC, which was badly damaged in the February 2021 Rishiganga flood. The state's own company is UJVN Limited.
Hydropower brings electricity, jobs and revenue. But the costs are heavy. The Tehri dam drowned the old town of Tehri and dozens of villages, and thousands of families were resettled. Tunnels for run-of-river projects can crack slopes and dry up springs, and long stretches of river are left with little water.
After the 2013 Kedarnath disaster, the Supreme Court and expert committees questioned many projects in the upper Ganga basin, and some were put on hold.
Why it matters. The hydropower debate is the clearest case of development versus ecology in Uttarakhand. Mains answers should weigh energy and income against displacement, springs and disaster risk.
Transport: roads, rail and air
Roads are the lifeline of the hills, because most villages have no other link. The biggest recent project is the Char Dham road project, which widens about 825–900 km of highways to Yamunotri, Gangotri, Kedarnath and Badrinath. Environmental groups challenged the width, but in 2021 the Supreme Court allowed wider roads on routes needed for defence near the China border.
The railway stops at the edge of the hills, at Dehradun, Rishikesh, Haridwar, Kotdwar, Ramnagar, Kathgodam and Tanakpur. The new Rishikesh–Karnaprayag broad-gauge line, about 125 km long and mostly inside tunnels, will for the first time take trains deep into Garhwal.
For air travel, the main airport is Jolly Grant near Dehradun, along with Pantnagar and Naini Saini at Pithoragarh. Helicopter services carry pilgrims to Kedarnath and link remote districts.
Building in these mountains is risky. Road cutting has made many slopes unstable, and the Silkyara tunnel collapse of November 2023 on the Char Dham route trapped 41 workers for 17 days before they were rescued.
Why it matters. Better links reduce isolation and support tourism and defence. Mains answers should also show the cost: landslides, debris dumping in rivers and the need for careful engineering.
Mains lens: practice questions and answer plans
UKPSC Mains asks about energy resources, hydropower, transport and infrastructure in the state. The questions below are our own practice questions in that style, not previous-year questions.
Q1. "Hydropower is both an opportunity and a threat for Uttarakhand. Discuss." (200 words)
- Introduction: State the potential and the label "energy state".
- Body: Weigh revenue, power and jobs against displacement, springs, river flow and disaster risk, with Tehri and Tapovan as examples.
- Conclusion: Suggest smaller projects, environmental flows, cumulative impact studies and local benefit sharing.
Q2. "Examine the benefits and risks of the Char Dham road project and the Rishikesh–Karnaprayag rail line." (150 words)
- Discuss pilgrims, tourism, defence and access.
- Then discuss slope cutting, debris, tunnels and the Silkyara collapse.
- End with geology-led design and slope protection.
Q3. "Why is illegal river-bed mining a concern in Uttarakhand?" (125 words)
- Explain the demand for sand and boulders.
- Then explain the damage to rivers, bridges and fish.
- Conclude with monitoring, legal mining and penalties.
Useful keywords: limestone, magnesite, soapstone, phosphorite, river-bed mining, Doon quarrying case, Supreme Court, energy state, 20,000 MW potential, Tehri dam 260.5 m, THDC, Koteshwar, pumped storage, Maneri Bhali, Vishnuprayag, Tapovan–Vishnugad, UJVN, displacement, run-of-river, tunnels, springs, Char Dham road project, defence, Rishikesh–Karnaprayag, Jolly Grant, Naini Saini, heliports, Silkyara.
Quick revision
- Main minerals: limestone, magnesite (Almora, Pithoragarh, Bageshwar), soapstone (Bageshwar), phosphorite, river sand and boulders.
- The Supreme Court stopped Doon valley limestone quarrying in the 1980s.
- The state is called the energy state, with over 20,000 MW potential.
- Tehri dam (Bhagirathi, about 260.5 m) is India's highest dam, run by THDC.
- Tehri complex: 1,000 MW dam, 400 MW Koteshwar, 1,000 MW pumped storage.
- Other projects: Maneri Bhali, Vishnuprayag, Chibro, Khodri, Dhauliganga, Tapovan–Vishnugad.
- The Char Dham road project covers about 825–900 km; the SC allowed wider roads for defence in 2021.
- The Rishikesh–Karnaprayag line is about 125 km, mostly in tunnels.
- Airports: Jolly Grant, Pantnagar, Naini Saini.
- The Silkyara tunnel collapse was in November 2023; 41 workers were rescued.
UKPSC PCS (Upper) questions from this chapter
Which of the following pairs is not correctly matched ? Name of Airport District
- (a) Nainisaini – Pithoragarh
- (b) Gauchar – Rudraprayag
- (c) Chinyalisour – Uttarkashi
- (d) Pantnagar – Udhamsingh Nagar
Show answer
(b) Gauchar – Rudraprayag · our answer; official key awaited
Which of the following pairs is not correctly matched ? Mineral Location
- (a) Dolomite – Dehradun, Pithoragarh
- (b) Soap stone – Chamoli, Bageshwar
- (c) Graphite – Almora, Nainital
- (d) Silica sand – Pauri Garhwal