TNPSC Group 4 course‹› 0:00 studied

TNPSC Group 4 · Module 53 · basic depth · 5 min

Time and work, pipes and cisterns

What TNPSC Group 4 asks from this chapter

Syllabus lines this chapter covers:

  • Part C: Aptitude and mental ability · Aptitude: simplification, percentage, HCF/LCM, ratio and proportion, interest, area and volume, time and work.

TNPSC Group 4 questions from this module are being sorted into our bank.

Cut to basic depth for TNPSC Group 4. 58 deeper paragraphs are in the full chapter.

Start from zero: a wall cut into strips

Ramesh can paint a school wall in 12 days, and Suresh can paint the same wall in 6 days. If they work together, how long will it take? Many students add the days and say 18, but two people working together must finish faster than either one alone.

A wall cut into twelve strips

Think of the wall as 12 equal strips. Ramesh paints 12 strips in 12 days, so he paints 1 strip a day. Suresh paints 12 strips in 6 days, so he paints 2 strips a day. Together they paint 3 strips a day, and 12 strips take 12 ÷ 3 = 4 days.

The key idea is the rate of work: how much of the job is done in one unit of time. Days do not add, but rates do. Once you know each person's rate, every question in this chapter becomes simple addition and division.

Why this topic exists. Every project, from a road to a vaccination drive, asks the same question: with these people and these machines, how long will it take? Planners estimate labour and time before money is released. The puzzles in this chapter are small, clean versions of that everyday planning.

Rates add, days do not

The fraction way. If a person finishes a job in n days, he does 1⁄n of it in one day. Ramesh does ¹⁄₁₂ a day and Suresh ¹⁄₆ a day. Together they do ¹⁄₁₂ + ¹⁄₆ = ³⁄₁₂ = ¼ a day, so the job takes 4 days.

The two-person formula. For A in a days and B in b days, the joint rate is 1⁄a + 1⁄b = (a + b) ÷ ab. Turning the rate upside down gives the time: ab ÷ (a + b) days. For 12 and 6 days this is 72 ÷ 18 = 4 days, the same answer.

Three people. Add all three rates. If A, B and C take 10, 15 and 30 days, the rates are ¹⁄₁₀ + ¹⁄₁₅ + ¹⁄₃₀ = ⁶⁄₃₀ = ⅕, so together they need 5 days. Do not try to use the two-person formula twice on three people without care; adding rates is safer.

Working backwards. If A and B together take 8 days and A alone takes 12, then B's rate is ⅛ − ¹⁄₁₂ = ¹⁄₂₄. So B alone needs 24 days. Subtracting rates finds the missing person.

A quick sense check. The time taken together is always less than the time of the faster worker alone. If two people take 12 and 6 days, the answer must be below 6. Any option above 6 can be struck off at once.

Why it matters. The rate idea is the backbone of the whole chapter, and of speed and distance in the next chapter too. Learn to ask "how much in one day?" before anything else.

Quick revision

One-page summary box
  • One day's work = 1 ÷ (days for the whole job), and rates of people working together add.
  • Two people taking a and b days finish together in ab ÷ (a + b) days.
  • Take the total work as the LCM of the days, so each person's daily work is a whole number.
  • Efficiency × time = total work, so a person twice as efficient takes half the time.
  • Wages are shared in the ratio of work done.
  • Man-days rule: M₁ × D₁ × H₁ ÷ W₁ = M₂ × D₂ × H₂ ÷ W₂.
  • Filling pipes add, emptying pipes and leaks subtract.
  • With phases or turns, add the work of each phase and watch the last day.

Check yourself

Exam-style questions on this chapter. Pick an answer to see the explanation. 0 of 40 answered

  1. A can finish a job in 40 days and B in 60 days. In how many days will they finish it working together?

  2. A and B together finish a job in 7 days, and A alone in 8 days. In how many days can B alone finish it?

  3. A can finish a job in 30 days and B in 45 days. In how many days will they finish it working together?

  4. A and B together finish a job in 4 days, and A alone in 6 days. In how many days can B alone finish it?

  5. A can finish a job in 30 days and B in 60 days. In how many days will they finish it working together?

  6. A and B together finish a job in 12 days, and A alone in 18 days. In how many days can B alone finish it?

  7. A can finish a job in 15 days and B in 60 days. In how many days will they finish it working together?

  8. A and B together finish a job in 15 days, and A alone in 20 days. In how many days can B alone finish it?

  9. A, B and C can finish a job in 8, 12 and 24 days. In how many days will all three finish it together?

  10. A, B and C can finish a job in 10, 15 and 30 days. In how many days will all three finish it together?

  11. A, B and C can finish a job in 10, 12 and 15 days. In how many days will all three finish it together?

  12. A, B and C can finish a job in 6, 12 and 24 days. In how many days will all three finish it together?

  13. 24 workers can build a wall in 20 days. In how many days can 6 workers build it?

  14. 25 workers can build a wall in 9 days. In how many days can 15 workers build it?

  15. 24 workers can build a wall in 15 days. In how many days can 30 workers build it?

  16. 18 workers can build a wall in 16 days. In how many days can 16 workers build it?

  17. 16 workers working 6 hours a day finish a job in 15 days. In how many days will 8 workers working 9 hours a day finish it?

  18. 10 workers working 6 hours a day finish a job in 20 days. In how many days will 8 workers working 6 hours a day finish it?

  19. 6 workers working 10 hours a day finish a job in 20 days. In how many days will 20 workers working 6 hours a day finish it?

  20. 12 workers working 9 hours a day finish a job in 20 days. In how many days will 12 workers working 6 hours a day finish it?

  21. A is three times as efficient as B, and together they finish a job in 16 days. In how many days can A alone finish it?

  22. A is three times as efficient as B, and together they finish a job in 12 days. In how many days can A alone finish it?

  23. A is four times as efficient as B, and together they finish a job in 15 days. In how many days can A alone finish it?

  24. A is twice as efficient as B, and together they finish a job in 18 days. In how many days can A alone finish it?

  25. Two pipes fill a tank in 10 and 15 hours, and a third pipe empties it in 12 hours. If all three are opened together, in how many hours is the tank full?

  26. Two pipes fill a tank in 20 and 30 hours, and a third pipe empties it in 60 hours. If all three are opened together, in how many hours is the tank full?

  27. Two pipes fill a tank in 15 and 20 hours, and a third pipe empties it in 30 hours. If all three are opened together, in how many hours is the tank full?

  28. Two pipes fill a tank in 6 and 8 hours, and a third pipe empties it in 12 hours. If all three are opened together, in how many hours is the tank full?

  29. A pipe can fill a tank in 6 hours, but because of a leak it takes 8 hours. In how many hours can the leak alone empty the full tank?

  30. A pipe can fill a tank in 4 hours, but because of a leak it takes 5 hours. In how many hours can the leak alone empty the full tank?

  31. A pipe can fill a tank in 5 hours, but because of a leak it takes 6 hours. In how many hours can the leak alone empty the full tank?

  32. A pipe can fill a tank in 9 hours, but because of a leak it takes 12 hours. In how many hours can the leak alone empty the full tank?

  33. A and B can do a job in 10 and 15 days. They work together and are paid ₹4,500. What is A's share in rupees?

  34. A and B can do a job in 12 and 18 days. They work together and are paid ₹6,000. What is A's share in rupees?

  35. A and B can do a job in 20 and 30 days. They work together and are paid ₹9,000. What is A's share in rupees?

  36. A and B can do a job in 15 and 10 days. They work together and are paid ₹5,000. What is A's share in rupees?

  37. A and B can do a job in 20 and 30 days. They work together for 6 days, and then A leaves. How many more days does B need?

  38. A and B can do a job in 12 and 24 days. They work together for 4 days, and then A leaves. How many more days does B need?

  39. A and B can do a job in 12 and 18 days. They work together for 4 days, and then A leaves. How many more days does B need?

  40. A and B can do a job in 15 and 20 days. They work together for 4 days, and then A leaves. How many more days does B need?

Previous year questions

Previous year questions for UPSC CSE will appear here once each one is checked word for word against the official question paper.

Frequently asked questions

A does a job in 10 days and B in 15. Together?

LCM 30 units: A does 3, B does 2 a day, so 30 ÷ 5 = 6 days.

How are wages shared in time and work?

In the ratio of work done, which equals efficiency times days worked.

If A is twice as efficient as B, how do their times compare?

A takes half the time B takes; time is inversely proportional to efficiency.

A pipe fills a tank in 6 hours and another empties it in 8. Both open?

Net rate 1⁄6 − 1⁄8 = 1⁄24, so 24 hours.