Module 4 · 6 min read · Free chapter
India's nuclear programme
Homi Bhabha is the father of India's nuclear programme, and Apsara (1956) was Asia's first research reactor. The three-stage plan moves from natural uranium in PHWRs to fast breeders and then thorium. Tarapur (1969) was the first power plant. India tested in 1974 and 1998, follows No First Use, and has not signed the NPT.
Start from zero: how it began
India began planning for nuclear science even before Independence. The man behind it was the physicist Homi Jehangir Bhabha, who is called the father of India's nuclear programme. In 1945, he founded the Tata Institute of Fundamental Research (TIFR) in Bombay.
Soon after Independence, the government set up the Atomic Energy Commission in 1948. In 1954 came the Department of Atomic Energy (DAE), placed directly under the Prime Minister, which shows how important it was thought to be.
The same year, the Atomic Energy Establishment was set up at Trombay, near Mumbai. Bhabha died in a plane crash in 1966, and in 1967 it was renamed the Bhabha Atomic Research Centre (BARC) in his honour.
Apsara: Asia's first research reactor
On 4 August 1956, a small reactor at Trombay called Apsara went critical, meaning its chain reaction became self-sustaining. It was India's first research reactor, and also the first in Asia.
It was followed by CIRUS in 1960, built with Canadian help, and the larger Dhruva in 1985. Research reactors do not make electricity. They make isotopes for medicine and industry and give scientists a place to train and experiment.
The three-stage programme
India has only small reserves of uranium, but huge reserves of thorium, among the largest in the world. Most of it lies in the monazite sands of the beaches of Kerala, Odisha and Tamil Nadu. Thorium cannot run a reactor directly, so Bhabha drew up a clever three-stage plan in the 1950s.
Stage 1 uses natural uranium in pressurised heavy water reactors (PHWRs). Besides electricity, these produce plutonium as a by-product.
Stage 2 uses that plutonium in fast breeder reactors. These are special because they make more fuel than they burn, by turning surrounding material into new fuel. The 500 MWe Prototype Fast Breeder Reactor at Kalpakkam leads this stage, and its core loading began in March 2024.
Stage 3 will use thorium as the main fuel. Inside the reactor, thorium is turned into uranium-233, which can then undergo fission. If it works at scale, India's thorium could power the country for centuries.
India's nuclear power plants
India's first nuclear power station was at Tarapur in Maharashtra, which began working in 1969 with boiling water reactors supplied by the USA.
Other major plants are at Rawatbhata in Rajasthan, Kalpakkam in Tamil Nadu, Narora in Uttar Pradesh, Kakrapar in Gujarat and Kaiga in Karnataka. The largest is Kudankulam in Tamil Nadu, built with Russia.
Indian engineers have steadily scaled up their own design. In 2020, Kakrapar unit 3 became the first indigenous 700 MWe PHWR to go critical.
The plants are run by the Nuclear Power Corporation of India Limited (NPCIL), set up in 1987. Total installed nuclear capacity is about 8 GW, giving roughly 3% of India's electricity.
Pokhran and the nuclear doctrine
On 18 May 1974, India carried out its first nuclear test at Pokhran in Rajasthan, code-named 'Smiling Buddha'. India called it a peaceful nuclear explosion.
On 11 and 13 May 1998, India carried out five more tests, called Pokhran-II or Operation Shakti, and declared itself a nuclear weapons state. 11 May is now observed as National Technology Day.
In 2003, India set out its nuclear doctrine. It rests on credible minimum deterrence, keeping just enough weapons to discourage attack, and No First Use, meaning India will not be the first to use nuclear weapons.
India has not signed the Nuclear Non-Proliferation Treaty (NPT, 1968) or the Comprehensive Nuclear-Test-Ban Treaty (CTBT, 1996). It sees them as unfair, because they let five countries keep weapons while barring others.
From isolation to cooperation
After the tests, India faced limits on getting nuclear fuel and technology from abroad. A turning point came with the India–US civil nuclear agreement, known as the '123 Agreement', concluded in 2008.
In September 2008, the Nuclear Suppliers Group (NSG), which controls global nuclear trade, gave India a special waiver. This let India buy fuel and reactors for civilian use, even though it had not signed the NPT.
India has since joined three major export-control groups: the Missile Technology Control Regime (2016), the Wassenaar Arrangement (2017) and the Australia Group (2018). It is not yet a member of the NSG, where some countries have blocked its entry.
Safety, liability and the road ahead
Nuclear safety is overseen by the Atomic Energy Regulatory Board (AERB), set up in 1983. The Civil Liability for Nuclear Damage Act, 2010 decides who pays for damage if an accident happens.
Uranium is mined by the Uranium Corporation of India at Jaduguda in Jharkhand. A large deposit has also been found at Tummalapalle in Andhra Pradesh.
The Union Budget 2025–26 launched a Nuclear Energy Mission with ₹20,000 crore for research on small modular reactors (SMRs). The aim is at least five indigenous SMRs by 2033 and 100 GW of nuclear capacity by 2047.
Mains lens: can nuclear power scale up?
India wants to grow nuclear power many times over, from about 8 GW to 100 GW. The questions in this section are practice questions written by us, not past papers.
Angle 1: fuel security. The three-stage plan aims to use India's thorium and cut dependence on imported uranium. Its success rests on fast breeders working well, which has taken decades.
Angle 2: speed and money. Plants have often been delayed. Smaller reactors and wider investment are being looked at to build faster.
Angle 3: liability and trust. Foreign suppliers have been wary of India's liability law. Local communities near sites such as Kudankulam have raised safety concerns, so clear rules and open dialogue matter.
Practice questions:
- Explain India's three-stage nuclear power programme. (150 words)
- What are the challenges in raising India's nuclear capacity to 100 GW by 2047? Suggest a way forward. (250 words)
Answer plan for the second question: Begin with today's capacity and the 2047 goal. Then cover fuel, delays, cost, liability and public trust. End with SMRs, faster approvals, stronger regulation and community engagement.
Quick revision
- Homi Bhabha: father of the programme. TIFR 1945, AEC 1948, DAE 1954, BARC name 1967.
- Apsara (4 August 1956): first research reactor in India and Asia.
- Three stages: PHWR (natural U) → fast breeder (Pu) → thorium (U-233). PFBR at Kalpakkam.
- First power plant: Tarapur, 1969. Largest: Kudankulam (with Russia). Operator: NPCIL.
- Tests: 18 May 1974 and 11 and 13 May 1998. Doctrine: No First Use. Not signed NPT, CTBT.
- 123 Agreement and NSG waiver, 2008. Joined MTCR, Wassenaar and Australia Group, not NSG.
| Year | Event |
|---|---|
| 1948 | Atomic Energy Commission |
| 1956 | Apsara goes critical |
| 1969 | Tarapur power station |
| 1974 | Pokhran-I |
| 1998 | Pokhran-II |
| 2008 | 123 Agreement, NSG waiver |
| 2010 | Nuclear liability law |